Epoxy Flooring Pasadena, CA

Epoxy Surface Professionals lay epoxy and polyaspartic floors over concrete in Pasadena, in houses that are mostly older than the coatings people have already tried on them. A sound slab is worth coating rather than replacing. What goes down on it, and how the work runs once it starts, follow from that.

Epoxy Floor Coating In Pasadena
Epoxy floor coating installed by Epoxy Surface Professionals

Why a Pasadena Slab Is Worth Coating Rather Than Replacing

Concrete rarely needs replacing. What gives out is the surface: floor paint rolled straight onto a sealed slab, a sealer worn through where people walk, or a coating that went down years ago and has begun to lift at the edges. The slab under all of it is usually sound, and an epoxy or polyaspartic floor keeps that slab and gives you a sealed surface on top of it instead of breaking the whole thing out and starting again. Two findings change that answer. Where the concrete has dropped rather than simply worn, it is a leveling job before it is a coating job. Where it is flat and in good order there is a case for polishing it rather than putting anything over it.

Which resin goes on top is the second question and it matters more than the color. Epoxy builds thicker and costs less to lay, and it belongs indoors, because ultraviolet light turns it yellow over time and an open garage door is enough to start that. Polyaspartic gives up some of that thickness and buys back time, holds its color where the sun reaches it, and takes traffic again long before an epoxy floor would. Most Pasadena floors end up with a polyaspartic seal over them for those two reasons. What polyaspartic buys and what it costs you is the same trade either side of the city line, and an Altadena slab of the same age is read no differently.

What Goes Down on a Pasadena Floor

The floor itself is three passes and they are the same three every time. A base coat goes into the open concrete, epoxy where the schedule allows it and polyaspartic where it does not, the flake is thrown into it while that coat is still wet so the chips key in rather than sit on the surface, and a clear polyaspartic seal coat goes over the top and takes the wear from then on. The build is the same whether the room is a kitchen, a workshop or a hallway. What changes is how heavy each pass is and what goes in the middle one.

That middle pass is the whole of the decision. Flake leaves a textured surface that takes dust and marks without showing them and gives grip underfoot. A solid color reads cleaner and shows more, and medium gray is the one most people settle on. Metallic epoxy carries its pigment in the resin itself, so no two floors come out alike. All three finish sealed right to the edges, so there is nothing for dirt to sit in and a sweep and a mop is the whole of looking after it. The flake blends and solid tones are laid out to look at before anything is ordered. A garage takes the same three passes built heavier, which is why a Pasadena garage floor is specified on its own terms, and the concrete outside the house is coated in polyaspartic instead.

Flake epoxy floor finished by Epoxy Surface Professionals
Concrete ground back to bare slab before coating by Epoxy Surface Professionals

How the Work Runs, and What It Turns On

The order does not change, only how long each part of it takes. We look at the floor and find out what is on it, grind it back to bare concrete, cut out and fill whatever the grinder exposes, prime it, lay the color or the flake, seal over that, and then leave it alone. You get the floor back for footfall first and for a car a good while later, and rushing either end of that is how a new floor picks up its first mark. Two porches in Pasadena had been painted over more than once before we were called, and once the old coats were off the whole job was finished inside about five hours. A Glendale floor in the same condition runs to the same sequence.

What moves the number is short and nearly all of it is decided on the concrete: how big the floor is, how many layers are already down, how much of the slab has to be rebuilt once they are off, and whether epoxy or polyaspartic goes over the top. Most floors we quote in Pasadena land between $5 and $7 per square foot once those are settled, and we are normally booking a couple of weeks out. Epoxy Surface Professionals hold a 5.0 rating from 120+ reviews. Tell us what is on the floor now and roughly when it went on, call (818) 359-3932 or fill in the quote form, and we will confirm the number on the slab.

Read what our customers have to say about us

[Contact Us]

GET A FREE Estimate

Please give us a call or fill in our contact form to receive more information about our flooring  services.

For instant reply you can call us, text us, or connect with us on social media.

Thank you! Your message has been received.

We'll get back to you as soon as possible.
Oops! Something went wrong while submitting the form.